LTS Architects London office

Jasper Hijink • Feb 09, 2020

Mymesh for new LTS Architects London office

LTS architects - 66 Wentworth Street, Spitalfields, London, E1 7BB
Background
Consultancy firm Hoare Lea was tasked to design the lighting for the new London office for LTS Architects in London, located on 66 Wentworth Street. The office is a modern design, with lots of exposed 'industrial' features (pipes, concrete, recycled 'plaster' board. It has two floors with open plan office areas, meeting rooms and communal areas including a kitchen.

Challenge
The lighting design approach is all about enhancing the space, reducing contrast and using RGB features to create pleasant background scenes. With concrete ceilings and exposed mechanics, the clutter has to be minimal.

Solution
For the lighting control the Mymesh system was selected. The wireless technology makes it very easy to install without complex wiring. The battery operated sensors and switches makes placement on concrete and exposed ceilings very easy. The lighting is operated based on PIR presence detection. To manage large contrast to the minimum for visual comfort, the light is kept at a comfortable background level during absence with RGB features giving coloured accents. Where natural light pours in, the lighting is dimmed with day light harvesting for the main areas. The meeting rooms have different scenes that can be selected by the users. The system is connected to the Cloud via an ethernet gateway.

Benefits

The thrilling element is the future developments; the site is a test-bed to develop a user-friendly LightSIM Controls App© by Hoare Lea, that allows the the user to design and pre-view scenes for different areas and upload them to the network with the push of a button. This can be tailored for various applications like offices, hospitals or retail applications.


  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button

SHARE

by Connor Felstead 07 Oct, 2024
St Thomas’ Hospital expands with The Core
by Connor Felstead 16 Sept, 2024
Gravesend upgrades the lighting in Cascades
by Jasper Hijink 12 Sept, 2024
Unipart - NHS Supply Chain warehouse
by Connor Felstead 12 Sept, 2024
Bluewater uses Mymesh to upgrade the Toilet areas to Smart
by Jasper Hijink 11 Sept, 2024
Norwich Community Hospital's new £19.2m wing
by Jasper Hijink 10 Sept, 2024
Mymesh successfully extends the IASME IoT Cyber Assurance Certification (Level 2)
by Craig Stead 06 Sept, 2024
Circular Lighting Live
by Nicola Osborne 06 Sept, 2024
Exciting News...
by Ray Molony 05 Sept, 2024
St Thomas’ Hospital reuses lights and adds intelligence in major upgrade
MORE POSTS
Share by: